Minor Works Permits
The following documents have been prepared to assist applicants with the Minor Works Permit application process.
The documents do not replace the provisions of Council's Planning Schemes and Policies, or State Legislations and should not be used without reference to these documents.
Minor Works Permit Policies and Guides
- Temporary Road Closure – Administrative Policy 064
- Permit to Works in Road Reserve – Administrative Policy 065
Development Services Minor Works Permit Applications
The following work types are assessed by Development Services and require the submission of a completed Minor Works Application (Development Services) form:
- Bitumen Sealed Turnout / Shoulder
- Concrete Footpath
- Invert Crossing and Concrete Driveway
- Rural Access
- Stormwater Connection
For more information read the Minor Works Permits frequently asked questions for Development Engineering
The abovementioned work types, assessed by Development Services, can be lodged and the application fee paid via eApplications (Online Services).
Traffic and Investigations Minor Works Applications
The following work types are assessed by Traffic and Investigations and require the submission of a completed Minor Works Application (Transport & Drainage Infrastructure Planning) form:
- Alteration / Improvement to Roads
- Boat Mooring
- Gates and Grids on Roads
- Irrigation Pipes
- Landscaping Plan
- Temporary Road Closure
- Tracked Cane Harvesting Equipment Crossing
- Underground Utility Service Connection
- Use of Roads for Regulated Purposes
The above-mentioned work types, assessed by Traffic and Investigations, can be lodged via email to council@mackay.qld.gov.au.